Engineering Success
Customers around the world rely on the Timberland Group to deliver engineered projects that create opportunities and reduce risk while achieving operational goals.
Construction | Mining | Electric Power | Underground | Offshore | Marine
Construction
Timberland supplied the derrick and drum hoist used to dismantle the tower for tallest residential structure in New York, completed in October, 2014.
Learn More
The V.C Summer Nuclear Station is being built with a 6800-tonne ringer derrick using a hoist and control systems from Timberland.
Learn More
Timberland provided the derrick and hoist used to dismantle the construction tower crane for the tallest building in the western hemisphere.
Learn More
This bridge reconstruction project called for safely lifting and positioning massive 750-ton precast bridge segments delivered on barges.
Learn More
The Hoover Dam Bypass urgently needed a fast-track replacement for its highline lift system after its original cranes were swept away by gusting winds.
Learn More
The Kiewit HLD in Texas relies on precise synchronization of multiple hoists to safely handle loads of up to 13,000 tons.
Learn More
Mining
Marcotte met the challenge of designing and manufacturing an Ultra-High Scissor Lift for Cementation Canada Inc. in their short 10 week time frame.
Learn More
Marcotte met a customer’s request for a multipurpose utility vehicle that reduces the need to purchase and maintain up to 5 different vehicles in its fleet.
Learn More
A full team effort by Marcotte helped Xstrata to field 20 new vehicles and meet its targets for bringing Nickel Rim on-stream.
Learn More
Marcotte developed a new scaled-down line of small drift utility vehicles to support Canada’s largest gold mine.
Learn More
Marcotte expedited delivery of equipment for new underground operations before ice roads to the mine melted with the Spring thaw.
Learn More
Timberland’s tensioning system helped Peru’s largest mining company meet its goals for higher reliability and productivity.
Learn More
Timberland engineering achieved the required geometry to improve the hoist’s capacity and speed within the existing mounting constraints.
Learn More
Construction of a new service shaft in the potash mine relies on four synchronized 50-ton winches from Timberland.
Learn More
3D modeling facilitated this engineered upgrade to fit within existing mounting constraints at the Goldex mine.
Learn More
This truck-mounted MRH emergency egress system allows dramatically faster response to maintenance problems deep in the Zhangji Mine in China.
Learn More
Electric Power
Timberland custom engineered a full suite of conductor stringing equipment to sustain the climate and terrain conditions of Taiwan.
Learn More
Fast delivery of a full suite of stringing and tensioning equipment from Timberland helped Valard Construction to install 4700 km of conductor for Ontario Hydro in just 4 months.
Learn More
The custom engineered puller-tensioner system from Timberland included a trailer-mount able to travel at highway speeds.
Learn More
Timberland Equipment supplied a 7.5-ton tensioner, powered reel stands, two-bundle stringing blocks and a running board for McGregor Construction to install transmission lines under a tight schedule.
Learn More
Stringing a new power grid through an ecologically sensitive area required up-to-date application support as well as new equipment for the job.
Learn More
Jiangsu Power Company was able to erect a 500 kV transmission line through rugged central China with 28 ton puller and 20 ton tensioner from Timberland Equipment.
Learn More
Underground
The City of Los Angeles Public Works replaced its complete rodder fleet with the OK Champion S660 from Timberland.
Learn More
Offshore Oil & Gas
Timberland supplied the underwater fairleads for a 12-point mooring system using 142 mm chain.
Learn More
Timberland supplied the complete 9-point mooring system including chain jacks, underwater fairleads and electro-hydraulic power unit for Williams’ Gulfstar 1 FPS.
Learn More
This barge-mounted system featured horizontally opposed chain jacks rated at 1100 tons pull to set, test and certify 8 mooring anchors.
Learn More
Malaysia’s first deep-water semi-submerisible project was successfully moored in just 11 days.
Learn More
Sophisticated control systems provide this FPU with highly reliable automatic self-correcting operation.
Learn More
P-56 is a semi-submersible platform installed 125 km off the coast of Brazil, now moored to the seabed at a record 1800 m depth.
Learn More
Effective project coordination resulted in a successful deep-water deployment in China’s Bohai Bay oil field.
Learn More
Marine
Integrating a new double-drum towing winch and controls into this 2400 HP tugboat required a close fit with available deck space and hydraulics.
Learn More